Applying for Building Control Through an RBCA – How Does It Work?

Sep 20
2 min read

Updated: 9 hours ago

If you’re planning building work, you may need to make an application for Building Control approval. Using a Registered Building Control Approver (RBCA) provides an independent Building Control service to help assess your project against the requirements of the Building Regulations.

But what does the process actually involve?


1. Get in touch with an RBCA

The first step is to contact a Registered Building Control Approver with details of your proposed project. This might include the location, type of work, dra

wings, specifications and any other relevant information available at the time.


2. Receive a fee proposal

Your RBCA will review the information provided and issue a fee proposal for the Building Control services required. The level of information and complexity of the project will help determine the appropriate scope of work.


3. Submit your Building Control application

Once you are happy to proceed, the required application information is submitted to the RBCA. Depending on the project, this may be dealt with through a Full Plans application or, where appropriate, a Building Notice.



4. Plans and information are assessed

For Full Plans applications, the submitted drawings and technical information are assessed against the applicable requirements of the Building Regulations. Where further information or amendments are required, these will be identified and discussed with the relevant project team.


5. Building work commences

Once the necessary Building Control procedures are in place, construction can begin in accordance with the applicable requirements. It is important that the Building Control body is notified at the relevant stages so that inspections can be arranged.


6. Site inspections

Throughout the construction process, the RBCA will carry out inspections at appropriate stages of the work. The purpose of these inspections is to assess the work that is visible and accessible at the time of inspection and to identify matters that may require further information, investigation or remedial work.


7. Completion

Once the works have been completed and the RBCA is satisfied that the Building Regulations requirements have been met, the appropriate completion documentation can be issued.


Why use an RBCA?


A Registered Building Control Approver provides an independent third-party Building Control service, helping to ensure that the project is assessed against the relevant Building Regulations requirements.

It is important to remember that Building Control approval does not replace the responsibilities of the client, designer or contractor. The person carrying out the work remains responsible for ensuring that the construction is properly designed and built in accordance with the Building Regulations and other applicable requirements.


Planning a project?

Whether you are considering a domestic extension, renovation, new build or commercial development, engaging with Building Control early can help make the process clearer and more straightforward.


Meadows & Turner Building Compliance Ltd – providing professional Building Control services for domestic and commercial projects.

 
 